•  
  •  
 

Abstract

Construction of new facilities is a risky enterprise due to the situational aspects of the project, multiple parties involved in the process, timing and budget constraints, and the design features and quality levels required by the owner. Decision makers are charged with selecting a project delivery system to successfully manage the design and construction process in order to meet the owner’s needs. This paper documents the delivery methods utilized for the construction of public schools in Florida, Georgia, North Carolina, and South Carolina from 2006 to 2012 and provides insight into the reasons for the delivery method selections made by those in decision-making capacities. The study revealed utilization differences between states, with the predominant methods being Design-Bid-Build and Construction Manager at-Risk. The data collection was completed in conjunction with a two-year study of the performance of project delivery methods for public schools completed in 2014.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.