Abstract

Cost overruns are a persistent issue in the construction industry. This paper investigates factors that may drive cost growth on public works contracts. The study collected data on 1,043 public works projects completed over a three year period. The analysis examined the impact of four factors on cost overruns: (1) Project type, (2) Contract size, (3) Contract duration, and (4) Construction placement (value per day). The data were analyzed using a combination of basic descriptive statistics along with statistical hypothesis testing of means for various factors affecting cost growth. Cost growth was found to vary significantly by project type, contract size, duration, and construction placement. The project types with the largest contribution to cost growth are New Construction, Building Repair, Utility and Paving. Further analysis of the cost growth investigated the frequency and magnitude of cost growth for different project factors. The results identify different levels of risk of cost growth for different project type and sizes. The findings can assist in the development of strategies to better anticipate or mitigate cost growth of different projects.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.