• Home
  • Search
  • Browse All Collections
  • My Account
  • About
  • DC Network Digital Commons Network™
Skip to main content
  • Home
  • My Account
  • FAQ
  • Contact Us
  • About
The Professional Constructor Clemson University
  •  
  •  

Home > The Professional Constructor > Vol. 43 (2018) > No. 2

 

Articles

PDF

The Professional Constructor, Full Issue, Volume 43, Number 02

PDF

Collaborative Risk Mitigation Through Construction Planning and Scheduling
Lane Kay Coble

PDF

Construction Disputes in the United States and the United Kingdom: A Comparison
Anusree Saseendran, Ben F. Bigelow, Zofia Rybkowski, and Dawn Jourdan

PDF

Application and Usage of Design-Build by State DOTs
Dennis Bausman, Mashrur Chowdhury, Christopher Cummings, and Sasi Selvan

PDF

Assessment of Electrical Contractors’ Perception and Practices with Project Risk Management
Anthony J. Perrenoud

PDF

Designing a Modular Building: A Case Study for Modular vs.Conventional Design for an Apartment Building
Christine Piper and Arun Thodupunoori

PDF

Examining the Microeconomics of Bid Difference of Engineer & Contractor Bids in Highway Construction
Robert Ryan, Randy R. Rapp, Mark Shaurette, and Sarah Hubbard

 
 
  • Journal Home
  • About This Journal
  • AIC Submission Guide for Authors
  • Contact
  • Most Popular Papers
  • Receive Email Notices or RSS

 

Search

Advanced Search

ISSN: 0146-7557

 
 
Elsevier - Digital Commons

Home | About | FAQ | My Account | Accessibility Statement

Privacy Copyright