Abstract

Four-dimensional building information modeling (4D-BIM or 4D Scheduling) is well known to benefit the construction industry in many ways. 4D-BIM is an effective scheduling technique which integrates traditional scheduling methods and advanced visualization of the construction sequences in a 3D environment. Despite the potential benefits of 4D-BIM to improve scheduling quality, errors still often occur in

construction schedules. The objective of this research is to understand the association between human errors and computer-aided scheduling. This paper focuses on examining the current practices of 4D-scheduling to gain insights on potential errors during the process of scheduling. Furthermore, the paper discusses a set of root causes of scheduling errors based on different types of human errors in cognition error theories. The research determined human errors through an integrated approach of literature review and a survey. The results of this study are expected to provide new knowledge about what human errors that commonly occur during the scheduling processing using BIM and their root causes. This study also discusses a few error reduction/prevention methods that can help BIM practitioners, schedulers, organizations to avoid perceived human errors during 4D-BIM work process.

Share

COinS
 
 

To view the content in your browser, please download Adobe Reader or, alternately,
you may Download the file to your hard drive.

NOTE: The latest versions of Adobe Reader do not support viewing PDF files within Firefox on Mac OS and if you are using a modern (Intel) Mac, there is no official plugin for viewing PDF files within the browser window.